Pic0o Posted August 14, 2008 Report Share Posted August 14, 2008 I just snapped some before bed pics, as I had all the tools for pics ready. :zzz: in minutes. I'll Resize after bed. Link to comment
J0k3r Posted August 14, 2008 Report Share Posted August 14, 2008 Nice job dookie Shit looks mad tight. How long did it end up taking you? Was the floor perfectly flat before you started? Link to comment
Pic0o Posted August 14, 2008 Author Report Share Posted August 14, 2008 ~ 2 Days, maybe 18 hours total on the install w/ Doug's main help and experience. The floor was not, and still isn't level for shit, but we got the tile flat enough that it's hardly noticeable. :) Floors are a Bitch and a Half. Our Kitchen is due next, but that will just be Vinyl, thus being a comparable breeze. Link to comment
Pic0o Posted October 6, 2008 Author Report Share Posted October 6, 2008 Bump the Dead! I put a single coat of paint on the door frames on Kat's side of the room, and I should finish up w/ a 2nd coat before it's too cold to vent the house of fumes. I'll try to do this up this week, and throw some updated pics on it, as my Ma Dukes was like 'Oh yeah, prove it. Pix Plz' (translated) :P Link to comment
JeT Posted October 7, 2008 Report Share Posted October 7, 2008 Fancy. The couches in the basement behind that sweet wooden divider thing look pretty cozy. Link to comment
Pic0o Posted October 7, 2008 Author Report Share Posted October 7, 2008 They still are, but the small one reaks of dog, since that is their domain. :) The painting was a no-go, as by time I got home, I relaxed for a few, then did Dynamis. Fun. :P Link to comment
Pic0o Posted March 7, 2009 Author Report Share Posted March 7, 2009 (edited) Much has changed downstairs, as Kat's PC is upstairs, and we removed the sink pictured. Attached are pics of where the sink was, and the 3 tiles I needed to remove, in prep for tiling that area, so it matches the rest of the room. Removing Tile sucks. Cracking the bond under the tile takes some time, and throws pieces all over the damn place. Be sure to wear eyewear. :P Also, I hit my hand w/ the hammer more time then I can count and I now have some nice tender spots. :stab: I have to get the right size cover for the Drain pipe, as Suds come out there during wash, and I got the wrong size. After cap is on, I'm mixing some Jolt and Rum to lead me into some Star Ocean. :yar: Sunday: I got the corner pieces cut and laid the tile. Letting the cement dry, then I will put the grout down and GG tile. :ahoy: Edited March 8, 2009 by Pic0o Phase 2 Link to comment
h0m3r Posted March 9, 2009 Report Share Posted March 9, 2009 I wish I had a house to do projects to ^_^ Link to comment
Pic0o Posted March 10, 2009 Author Report Share Posted March 10, 2009 Hehe, once you mack school, you can pay ours off. :P House Projects do make a good excuse to drink! You feel manly and achieved, so it's easy to justify those Jolt and Rum drinks ;) I got the grout down yesterday. I'll let it sit another day or two before I put the ceramic protective on the new tile, and floor will be done done. As you can see, and will more when I take another pic, the upper left tile has a bigger gap to the wall, as I mis-measured and/or dood cut it on the wrong side of my marker. Shit happens :P Once the wall is patched up, it should be barely identifiable. Link to comment
bbsweets Posted March 11, 2009 Report Share Posted March 11, 2009 Lookin good guys, can't wait to see the finished project :) Link to comment
Pic0o Posted March 12, 2009 Author Report Share Posted March 12, 2009 This has been Done! I should put the Tile Protection Juice down tonight Link to comment